AI infrastructure ยท GPU

GPU infrastructure sized for your AI workload

Avoid paying for idle capacity or running short at peak. We help you plan and operate GPU infrastructure for AI inference and training, based on measured workloads.

Book an architecture callSee the ARIA case study
NVIDIA logoNVIDIA
Kubernetes logoKubernetes
Docker logoDocker
Google Cloud logoGoogle Cloud
vLvLLM
Ollama logoOllama

What does GPU infrastructure for AI involve?

GPU infrastructure includes the accelerators, servers, drivers, scheduling and monitoring that run AI models. For language models, memory often sets which models fit, while concurrency and response targets determine how many GPUs you need.

The choice is not only about hardware. Serving software, quantisation and batching can change capacity needs substantially, so we test before recommending a purchase or long commitment.

GPU infrastructure: capacity planning inputs: model size, concurrency, latency target, traffic pattern, budget

Our GPU infrastructure services

Practical support for buying, renting and running GPU capacity.

Workload sizing

Measure representative traffic and test models to estimate required capacity.

Cloud or on-premises

Compare cloud GPUs, dedicated servers and owned hardware using your usage.

Kubernetes scheduling

Containerise workloads and schedule GPU resources for shared use where it suits.

GPU monitoring

Track utilisation, memory, temperature, queue time and cost per request.

Where should your GPUs run?

Cloud GPUs

Best forTesting, uneven demand and quick starts

Watch forAvailability and higher long-term cost at steady use

Dedicated servers

Best forSteady workloads wanting predictable pricing

Watch forMinimum terms and less flexibility

Owned hardware

Best forStrict data rules and long-term steady use

Watch forUpfront cost, power, cooling and maintenance

How we plan GPU infrastructure

We prove capacity with tests before a major spending decision.

Profile

Measure traffic and model behaviour.

Model

Compare options and running costs.

Pilot

Load test on rented capacity.

Deploy

Automate setup, drivers and scheduling.

Optimise

Review utilisation and scale decisions.

GPU infrastructure metrics that matter: gpu utilisation, memory use, queue time, cost per task

GPU infrastructure planning guide

Separate inference from training

Inference and training place different demands on GPU infrastructure. Inference needs steady response times and enough memory to hold the model. Training or fine-tuning runs in heavy bursts, so many teams rent capacity for it while keeping inference on dedicated resources.

Watch memory and concurrency

GPU memory determines which models fit, while concurrency and response length determine how many GPUs you need. Serving software that batches requests can substantially increase throughput, so test the full serving stack rather than estimating from hardware specifications alone.

Check the full cost

Compare more than the hourly or purchase price. Owned hardware adds power, cooling, space, spares and staff time. Cloud adds data transfer and storage. Calculate cost per completed task at your expected utilisation, because idle GPUs are the most expensive ones.

Plan for failure

GPU nodes fail and drivers change. Automate setup with containers, keep tested driver versions, and decide what happens if capacity is lost. Some systems can fall back to a smaller model or an external provider, which keeps essential services available.

Official resources: NVIDIA data center, Kubernetes GPU scheduling and vLLM documentation.

GPU infrastructure questions

How many GPUs do we need?

It depends on the model, concurrent users, response length and latency target. We run load tests on representative traffic rather than relying on a general rule.

Should we buy or rent GPUs?

Renting usually suits testing and uneven demand. Buying can make sense for steady, long-term use or strict data requirements, once power, cooling and support are included.

Can several applications share a GPU?

Often yes, with suitable scheduling and limits. Latency-sensitive services may still need reserved capacity.

Can you reduce our current GPU costs?

Often there is room to improve through model choice, quantisation, batching and better scheduling. An audit of real usage shows what is possible.

Related AI infrastructure and services

Size your GPU infrastructure

Share your model, usage and response targets, and we will build a capacity plan you can test.

Talk to our AI infrastructure team